Drum studio build #5. Work, work, work.

13 Apr

Work on the studio has stopped for a few days as I’m busy tutoring on a wind band course and playing a weeks run of ‘Titanic’ the musical (the Percussion section has been demoted from the pit so I’m watching the conductor on a monitor, always joyous!).

We’ve completely finished doing the rockwool and plasterboarding the ceiling (was pretty tiring on the arms) and the wall plasterboarding is mostly done.

This weekend I’m intending to finish all the plasterboard and hopefully put up the double doors (chunky fire doors). I’ve never hung a door before, but have borrowed a mates plane in case I need it. Wish me luck!

The website redesign’s coming along nicely too and I’m starting to think about any extra bits of equipment I want in my shiny new studio, now we’re talking 🙂

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: